承包商质量控制计划beplay7.com- Purpose

This quality control plan has been prepared to establish the quality control and Test to be conducted at the project work site.

承包商质量控制计划beplay7.com- Project Description

项目应表示位于XXX XXX上的XXX单元,XXX距离XXX大约XXX公里。

承包商质量控制计划beplay7.com- Project Definition

COMPANY is XXX Company (Plant Owner)

EPC承包商是XXX公司

TPI Third Party Inspection Agency is XXX Company

PROJECT is XXX Project XXX UNIT

建筑承包商是XXX公司

规格集体指的是合同文件中引用的所有技术规格,图纸,申请和其他技术文件。

QUALITY CONTROL collectively means quality control of the construction works for compliance with the project specification and all the engineering and construction procedures, specifications, codes of practices and engineering standards pertaining to the contract and would be done by construction contractors.

Inspection Survey, Test and/or Examination and would be done by a Third Party Inspection Company.

FIELD INSPECTION RECORD means the individual record of a required test or Inspection.

MILL TEST REPORT A document generated by the manufacturer of material, which completely identifies the supplied material and the specification under which it was produced and reports all required test values necessary to demonstrate compliance with that specification.

VT is Visual Inspection.

DT is Dimensional Check.

M is Monitoring which is a Random Check by direct/indirect inspection to ensure the conformance of the item or activity.

h是持有,这是不应继续进行的,直到检查成功完成。beplay体育官网电脑

MOM is Minutes of Meeting.

OPI is Opened Package Inspection.

W是证人,这是当一个建筑contractor notifies the EPC contractor and the third party inspection agency regarding the day and the corresponding activity for the inspection. In the case that an EPC contractor and inspection agency is not present, the construction contractor will continue the respective activity.

RD is Review of Documents & Certificates.

WPS是焊接程序规范。

PQR是焊接性能资格记录。

WPQ is Welders Performance Qualification Certificate.

NDT is Non-destructive Testing.

PWHT is Post Weld Heat Treatment.

DFT是干膜的厚度。

P&ID is Piping and Instrumentation Diagram.

N/A不适用。

A是批准,这是对具有适用规范的文档的审查和验证,并且是在进行之前要求的。

I.R.是绝缘抗性。

SHOULD Indicates recommendation but not necessary.

SHALL Indicates a mandatory requirement.

承包商质量控制计划 -beplay7.com 范围

The quality control plan covers the general field of inspection and testing of piping, equipment, pipeline and structural steel, electrical, instrumentation, insulation and painting activities during construction, installation, pre-commissioning and, commissioning at XXX Project.

承包商质量控制计划beplay7.com- Reference Documents

This is the list of related engineering documents issued by EPC contractors

承包商质量控制计划beplay7.com- Documentation

文件由授权人员准备,审查,批准和签发。要求进行多学科审查的文件与持有主要责任的关键人员以及应进行审查的当事方一起确定。

对项目文档的更改和修订由进行原始文件的检查和批准的同一学科/小组检查和批准。文档或附件中指示了变更和修订的原因,概述和要点的原因。

The type of documents to be controlled, the elements of control and the numbering system to be used on the PROJECT are defined.

文档控制系统

  • Identify the key documents, e.g., documents for progress measurement (such as P&IDs and Plot Plans), documents to be reviewed by CLIENT or requiring approval by third parties (e.g., Licensors) or regulatory authorities
  • 允许访问项目人员和客户
  • 记录问题日期和状态
  • 生成有关过期文件的文档状态和警告报告的报告

A document distribution matrix is prepared, which relates data and document types to interested parties. The distribution to the CLIENT and third parties is reviewed and agreed upon with such external parties. Distribution within an organization is specified by each section manger and reviewed by the Project Manager. Internal distribution is on an “as needed basis”, i.e., selective distribution and not indiscriminate distribution to a large number of project personnel. Key personnel ensure that the related disciplines/sections have been included in the distribution list.

A master copy of each document is kept in a Centre File. When updated documents are issued, the previous revision is marked “Superseded”.

承包商质量控制计划beplay7.com- Quality Records

质量记录控制(包括质量控制记录)是QC经理的责任。beplay7.com质量记录包括:

  • The person in charge for specific items
  • The identification of regulatory and CLIENT requirements for permanent records
  • Retrieval, filing and indexing of the fabrication record books
  • Submission format, quality of reproductions, number of copies and archive requirements
  • Final disposition at completion of the work
  • Results of reviews, inspections, tests, audits and materials certificates
  • Qualification of personnel, procedures and equipment
  • Non-conforming and corrective action reports
  • Other documentation, such as drawings, specifications

测试报告是在测试完成后的7个工作日内准备的,并立即提交。

All repair procedure, specific method statements and Test Equipment Calibration Certificates, as required by the requisition, are reviewed approved prior to use.

In case of conflict, the orders of precedence are as follows:

  • 合同
  • AFC Drawings
  • Project Specification
  • Other relevant Project Specification
  • Applicable Codes and Standards

承包商质量控制计划 -beplay7.com 代码和标准

The codes and standards that the contractor will follow will be laid out. Theseincludes codes and standards for installation, construction, fabrication, inspection and/or testing of materials, services, or equipment for the XXX Project is in accordance with those specified in the contractual documents, purchase order, requisition specification, data sheets and drawings.

The Construction contractor will refer queries regarding the referenced codes and standards to the EPC CONTRACTOR and TPI for decision.

Material Receiving Quality Control

一旦设备和材料交付到现场,就会由材料控制器执行接收质量控制。beplay7.com接收质量控制后,材料控制器准备了beplay7.com材料接收报告。

If any loss, damage or quality faults are found, a Shortage/Damage or Non-conformity Report is made and reported to the site manager using the "Shortage/Damage or Nonconformity Report".

Field Quality Control and Test

EPC承beplay7.com包商和工厂所有者的认可根据检查和测试计划(ITP)进行现场构建的质量控制和测试。beplay体育官网电脑beplay体育官网电脑ITP未涵盖的检查和测试应按照发行的图纸,规格,代码和标准在工作执行阶段的过程中,具体取决于特定的工作要求。

Alteration is made in the form of changes as per specific WORK requirements from time to time.

建设有限公司ntractor informs in writing the EPC Contractor and TPI of the inspection points (WITNESS & HOLD), which are required to be witnessed before execution of any stage of the work.

Inspection and Test Plan

The EPC Contractor inspection and test plan has been considered in this quality control plan.

施工承包商控制了个人检查程序,以进行进程或最终质量控制/测试,并记录下来。beplay7.combeplay体育官网电脑记录是工作指导,清单和测试记录,这些记录证明工作已通过质量控制和/或具有定义的接受标准进行测试。beplay7.com

施工承包商与EPC承包商举行了检查前会议,以解决有关遵守个人质量控制程序,特beplay体育官网电脑定质量控制要求和相关规范的问题。beplay7.com建筑承包商安排以所有必要的方式达到出勤,以解决技术问题,时间表和质量控制要求。beplay7.com

beplay体育官网电脑检查访问

建设有限公司ntractor provides free entry to any part of site to the EPC Contractor and plant owner inspectors for testing /inspection, on any contracted portion of the project that is being performed.

The Construction contractor cooperates with the inspector to monitor, audit and visit plants or other inspection locations where work is undertaken as part of the scope of work for the project.

NON-CONFORMANCE CONTROL

Non-conformances are classified as follows:

  • Major non-conformance: affecting the safety and operation of equipment or plant component.
  • Minor non-conformance: not designated as major non-conformance.

When a non-conformance is found, the non-conforming system or materials are marked or tagged. A non-conformance report showing the cause and recommended corrective action is prepared by quality control personal. Clarification of minor non-conformance would be the responsibility of the quality control manager.

对于主要的不合格,由建筑承包商准备的所有维修程序都将提交给EPC承包商,并将由EPC承包商审查以供批准。

在执行所有维修期间beplay7.com,需要进行足够细节的所需质量控制。

beplay体育官网电脑根据项目规范检查工作流图表

Site / Contractor Quality Control Plan Sheets

合同or QC Plan for Piping Construction

合同or QC Plan for Rotary Equipment Installation

合同or QC Plan for Chilled Water Unit Installation

承包商QC民事诉讼计划

承包商QC电气设备安装计划

合同or QC Plan for Fix Equipment Installation

合同or QC Plan for Hot Oil Furnace

合同or QC Plan for Instrument equipment Installation

合同or QC Plan for Insulation Work

合同or QC Plan for Painting Work

合同or QC Plan for Silo and Hopper Construction

合同or QC Plan for Steam Generator Package Installation

合同or QC Plan for Steel Structure

承包商QC储罐勃起计划

合同or QC Plan for Welding Work

Related Articles:

Quality Control Plan,Quality Control Manuals for Contractors,beplay7.com质量控制手册,THird党检查beplay体育官网电脑,Pre-Shipment Inspection,Goods Inspection,Factory Acceptance Test,Shop Inspection,供应商检查,beplay体育官网电脑beplay是正规的吗商品检查,beplay体育官网电脑供应商检查beplay体育官网电脑Services,商品检验服务beplay体育官网电脑,beplay是正规的吗商品检验服务,beplay体育官网电脑货运前检查服务beplay体育官网电脑,Industrial Quality Control,Quality Control Forms,Corrective Action Plan Template


Return from Contractor Quality Control Plan to IndustrIal Quality Control

Return from Contractor Quality Control Plan to Inspection for Industry Home


Did you find this article useful? Click on below Like and G+1 buttons!

New!Comments

Have your say about what you just read! Leave me a comment in the box below.
Baidu