The Third Partybeplay体育官网电脑储罐的检查文章提供了在商店和现场进行储罐检查和测试的示例程序。beplay体育官网电脑您可以查看storage tank inspection and test planwith this procedure.

This content guides about all necessary stages in the production of the storage Tanks from the examination of material, welding, fabrication, NDE, dimensional inspection to the final inspection, preservation and packing to despatch to site. This content is primarily for mill and prefabrication stages with site erection being covered in outline only.

You need to take this point in account this article is written for a typical storage Tank and might not be complete for special cases.

All storage Tank inspections and tests are carried out against the approved drawings, purchase order specifications, purchasers or company standards, and within the practices and rules of the country, state or province and any government decrees, laws, ordinance or regulation as may apply.

The applicable codes and specifications for the Storage Tank which is under construction process are:

  • Design code
  • Purchase order specification
  • 购买者的标准
  • 批准的图纸

适用的代码和标准是:

  • API 650
  • API 620

The applicable codes and standard may be based other international standards such as BS 2654 and etc. This content is general and can be useful if even the design code is different from API Code.

第三方检查员审查所需的文件:

The list of documents normally is agreed in the Pre Inspection meeting which is hold several weeks before actual commencement of inspection work. The parties which are participated in this meeting are manufacture, purchaser andthird party inspection agencyrepresentatives.

These are the list of documents which are normally agreed to be presented to the inspector:

第三方检查储罐beplay体育官网电脑- Material Inspection

The first actual inspection work in the storage Tank is raw materials inspection.

The original or authenticated copies ofmill test certificatesof material normally are available at manufacturer's premises.

The third party inspector examines these certificates for compliance with specifications and where appropriate, drawings.

评论包括:

  • 证书号码。
  • Heat or cast No.
  • Chemical composition.
  • Mechanical properties.
  • Heat treated condition.
  • NDE applied and results.
  • Surface finish

Then the inspector witnesses the materials identification on the certificates against materials marking. It is also necessary to check with storage Tank drawing datasheet, material list and other specification as appropriate.

The identification such as Heat No. needs to be transferred to cut off components.

目视检查表面表beplay体育官网电脑面表面和可能的缺陷,还需要控制对规范的维数。

When the third party inspector carried out the material inspection, then provides inspection visit report (IVR), the report contains following items:

  • 确认令人满意的文件审查
  • Record of the endorsement of certification reviewed/witnessed
  • Record of all non-conformities
  • 目睹的任何测试的记录和结果

第三方检查储罐beplay体育官网电脑- Fabrication Inspection

When the storage tank material inspection carried out and result was satisfactory or non-conformities closed by remedial action, then storage tank manufacture will be authorised to start fabrication.

检查范围beplay体育官网电脑是在ITP中确定的,一些客户更喜欢拥有严格的控制,并将TPI检查员放入更多“hold points” in fabrication activities and some others may take lesser “hold points” and put TPI much more in the review document.

This depend to the inspection budget which client assign for inspection, much more inspection will have much more costs and less risks and conversely less more inspection will have less costs but more risks.

Third party Inspector is pays attention to the following points on a basis to be outlined in the purchaser's documentation, quality plan, test and inspection plan, or other document, as notified to the inspector.

第三方检查储罐准备beplay体育官网电脑

Third party inspection carries out visual and dimensional check to ensure compliance with WPS and specification. Where specified, weld bevels are examined by MT or PT after grinding/machining.

Edges and weld bevels need to be clean, dry and free from surface defects,laminations, cracks, voids, notches, etc.

These are causes for rejection unless suitable/satisfactory remedial action can be taken. Welding repairs to bevels are not permitted, without approval from the engineer/inspector. Inspectors needs report excessive or serious defects.

Plates subject to forming, rolling or dishing may require additional heat treatment and NDE to meet code requirements.

第三方检查储罐壳式课程和beplay体育官网电脑包含焊接接缝的底​​板

This stage inspection is carried out when plates have been tacked using welding consumables and other parameters from an approved WPS.

Third party Inspector checks and report on:

  • Cleanliness and fit up accuracy of weld preparation.
  • 板的平坦度,预防失真的方法,例如测序的焊接,强力,后退等。
  • Application of preheat.
  • Storage and handling of welding consumables.
  • 焊接正在进行的相互通行条件。
  • 清洁焊缝。
  • 完成测试优惠券(指定)
  • NDE。结果需要满足规格或代码要求。
  • Hardness tests - when specified.
  • Impact tests - when specified.

Weld repair may be permitted in accordance with the code requirements and is carried out only after investigation of the probable cause and in accordance with approved WPS documents.

所有焊接维修都需要由第三方检查员报告给客户。

第三方检查储罐的第三方检beplay体育官网电脑查焊接热处理热处理

第三方检查员进行尺寸检查并审查炉子记录图,以确保按规定进行热处理。

可以使用硬度测量来确定材料,热影响区或焊缝的状况。然后,检查员在PWHT之后检查尺寸,曲率等。

第三方检查储罐 - 集会beplay体育官网电脑检查

Storage tanks may sometimes be assembled prior to despatch, this is witnessed and the results of any filling test recorded.

The number and thickness of the plates are checked if no trial assembly has been possible. Plates with access holes, manways and valve openings are visually and dimensionally checked.

匹配标记,标识标记被检查到图形要求。姓名板如果附件,则需要按照批准的图纸进行。

第三方检查储罐beplay体育官网电脑绘画和涂层

Surface preparation for painting is checked for the following points, according to specification by third party inspector:

表面状况需要不受针孔,施加伤害和其他不连续性

第三方检查储罐beplay体育官网电脑Spares and Accessories:

第三方检查员控制备件,工具和配件,并根据采购订单规范和包装清单对材料,工艺和数量进行视觉和尺寸检查。beplay体育官网电脑

需要检查标记和/或标签以获取标识。

第三方检查储罐beplay体育官网电脑- Reporting:

Third party inspector provides Inspection Visit Report (IVR) after each visit as well as a final report summarising the activities carried out during the storage tank production in accordance with the contract requirements and circulated within the time limits specified in the contract.

该报告的格式是客户要求的,清楚地表明了对储罐的最终接受或拒绝。

第三方检查储罐包装,Mbeplay体育官网电脑arking and Shipping:

The following points are checked by the third party inspector:

储罐的第三方检查 - 制beplay体育官网电脑造商店文件

The following final documents are reviewed and signed off by third party inspector to the contract or purchase order requirement.

这些可能适用于商店和现场运营。

Component detail drawings,Manufacturer's data reports,Material certificate or certified mill test reports,Material list or map,每个接缝的焊工记录,Heat treatment records (Temperature-time record chart during PWHT),Dimensional record,NDE records,Hardness test record,Packing list,备件和工具列表。

第三方检查储罐 - 现场beplay体育官网电脑架设

网站第三方检查员负责all site operations up to and including final testing and certification of storage tanks.

Many operations are identical in nature to those already described for materials and fabrication inspection in the shops.

However, other factors which are likely to be more pertinent, include the necessity to closely watch for satisfactory climatic conditions and metal temperatures during welding and careful storage and handling of materials.

现场第三方检查员仔细监视焊工资格的工作现场记录,批准的焊接程序以及现场存储以及焊接消耗品的处理。

The site third party inspector cross-checks all incoming plate, fabrications and material against certification. He ensures all material is clearly identified and during construction monitors transfer of markings, which is made to ensure all material of the completed tank is identifiable by such markings.

In the case of thin plates, marking need to be applied by painting or etching. All material need to be inspected prior to incorporation in the tank to ensure correct dimensions and freedom from unacceptable flaws, especially in edge preparations.

检查员确保仅使用批准的程序,并且所有焊工和操作员都有适当的资格。按照规格指示,所有焊缝都清楚地识别出焊工的邮票或油漆标记。

All welds need to be made to approved WPS and be inspected for conformity to finish profile.

NDE的程度and all NDE requirements are monitored. Radiographs are reviewed and signed off by site third party inspector when they are satisfactory.

所有需要维修的缺陷均已记录并报告,并且检查员确保仅使用批准的焊接程序。

检查员确保将焊缝的任何必需的偏移或错开都正确纳入代码或项目要求。在附着之前,检查所有配件和制造是否符合储罐曲率。目睹了重大维度检查,以确保在指定的直径,高度,圆形等的公差内合规。

第三方检查储罐 - 现场beplay体育官网电脑勃起测试

All pre-test procedures are monitored by third party inspector, including crack detection where required.

Hydrostatic and pneumatic tests are observed and reported, including vacuum box testing.

第三方检查储罐 - 现场beplay体育官网电脑勃起文件

储罐建设和测试的各个方面完成后,请审查整个质量验证和施工文件包,以确保准确性和完整性,然后根据合同或采购订单要求进行接受报告。

第三方检查储罐站点勃起 beplay体育官网电脑- 最终认证

Certification of completed tanks for compliance to code and specification requirements are prepared and countersigned by the site third party inspector prior to distribution, in accordance with project requirements.

第三方检查储罐beplay体育官网电脑- Reporting:

Third party inspector provides Inspection Visit Report (IVR) after each visit as well as a final report summarising the activities carried out during the storage tank production in accordance with the contract requirements and circulated within the time limits specified in the contract.

该报告的格式是客户要求的,清楚地表明了对储罐的最终接受或拒绝。

第三方检查储罐beplay体育官网电脑- Release Note:

When required by the contract or purchase order a release note is issued bythird party inspection agencyand given to the manufacturer when the Storage Tank have been finally accepted.

还给Third Party InspectionorStorage Tank Inspection

Related Articles:

Third Party Inspection for Reciprocating Compressor,离心泵的第三方检查beplay体育官网电脑,Third Party Inspection for Gas Turbine,Third Party Inspection for Steam Turbine,Third Party Inspection for Fan and Blower,Third Party Inspection for Water Tube Boiler,Third Party Inspection for Fire Tube Boiler,Third Party Inspection for Shell and Tube Heat Exchanger,Third Party Inspection for Fin Tube Heat Exchanger,第三方检查压力船beplay体育官网电脑,Third Party Inspection for Centrifugal Compressor,Third Party Inspection for Line Pipe,Third Party Inspection for Valve,第三方检查钢结构beplay体育官网电脑,Third Party Inspection Services,Third Party Inspection Agency,Third Party Independent Inspection,Third Party Quality Inspection

Did you find this article useful? Click on below Like and G+1 buttons!

New!Comments

Have your say about what you just read! Leave me a comment in the box below.
Baidu